Worked example · one-off build in Europe

Rotating display for a trade fair stand

A waist-high display column with a slowly turning top plate and printed covers in the exhibitor's colours.

Delivered in
14 business days
One price
EUR 1,808
Positions
6
Suppliers asked
10

The request

A display stand for our trade fair booth that slowly turns our product on top, in our brand colours, ready in three weeks.

The draft

A laser-cut and bent aluminium column with a turntable on a slewing bearing, driven by a quiet geared motor. Printed covers hide the drive and carry the logo. A plug-in power supply, no programming needed. Delivered on a pallet to the fair.

Drawing: Rotating display for a trade fair stand

Technical drawing

Engineering drawing of Rotating display for a trade fair stand: two views with dimensions, part numbers that match the plan, and a title block

Example drawing with design values from the draft, not for manufacture. The numbers in the balloons are the positions in the plan below.

Plan and quotes

Every position with its route, the suppliers asked and what they quoted. Example figures, not a quote.

NoPart and routeEstimateOptSupplierPrice sourceTimePrice
01Column and top plateLaser-cut and bent aluminium sheet2 alternatives5 d
EUR 460
ALaserBoostQuote5 dEUR 460
BFractoryQuote4 dEUR 515
02Covers with logo3D-printed, dyed2 alternatives6 d
EUR 390
AMaterialiseQuote6 dEUR 390
BSculpteoQuote7 dEUR 352
03Turntable bearingCatalogue slewing ring4 d
EUR 120
igusQuote4 dEUR 118
04Turntable driveGeared DC motor from a catalogue2 alternatives6 d
EUR 160
AFAULHABERQuote5 dEUR 171
BmaxonQuote7 dEUR 158
05Assembly and test runMachine builder4 d
EUR 540
Bauer Maschinen und TechnologieQuote4 dEUR 540
06Pallet delivery to the fairFreight transport2 alternatives2 d
EUR 180
AEurosenderQuote1 dEUR 194
BDAGO ExpressQuote2 dEUR 180
Total, best value per line14 business days, EUR 1,808

Green lowest price or fastest, red highest or slowest among alternatives, shaded row best value (price and time weighed).

How to read this table

Best value weighs price and time: a saved business day counts as 3% of the cheapest quote, so a slightly dearer but quicker quote can win. Catalogue prices are published list prices from the named source, so VAT status varies; their time is the line estimate. Red lines have no price yet. Quotes, then parts run in parallel, then assembly and transport. Production sites are city-level.

Shipments on the map
ShipmentFromToTime
Column and top plateLaserBoost, ManresaBauer Maschinen und Technologieday 4 to 6
Covers with logoSculpteo, VillejuifBauer Maschinen und Technologieday 5.2 to 8
Turntable bearingigus, KoelnBauer Maschinen und Technologieday 3.4 to 5
Turntable drivemaxon, SachselnBauer Maschinen und Technologieday 5.2 to 8
Pallet delivery to the fairBauer Maschinen und Technologie, WeilheimNurembergday 12 to 14

Build something like this

physicaleurope plans, sources and delivers builds like this as single pieces. Describe what you need in one sentence. Agents send the bill of materials they drafted as JSON: see build requests for agents.

Start a project